Conducting a meeting with some engineers to a Design FMEA is pretty hard because the engineers are always busy. Gathering several engineers and conducting a long hour meeting not only makes a pressure on the project schedule but put an additional burden on the engineers. Even worse, the Design FMEA meeting does not create a tangible design elements. But the manager and the engineer could be relieved from the burden if they understand a positive effect of Design FMEA.
Continue reading “Case Study: Effect of Design FMEA”Essay: Failure Mode in FMEA (2)
I had been thinking other failure modes in FMEA after posting the previous article. Then I found a good information in ASQ (American Society for Quality) regarding the FMEA. Based on the information and my experiences, I added some other failure modes and created a list of them..
Continue reading “Essay: Failure Mode in FMEA (2)”Essay: Failure Mode in FMEA (1)
The FMEA (Failure Mode and Effect Analysis) could be the most abused tool in Lean Six Sigma.
Continue reading “Essay: Failure Mode in FMEA (1)”